BUILDERS IN ALDERLEY EDGE · SK9
JNR Construction is the design-to-build partner for Alderley Edge’s most considered homes. For SK9 homeowners who value discretion and precision, and architects who need a contractor they can refer without risk — high-end extensions, whole-house renovation, and replacement dwellings under CDM 2015.
20 Years. 400+ Projects. Federation of Master Builders.






Alderley Edge is one of the highest-value residential locations in Cheshire East, in the SK9 postcode district between Wilmslow, Prestbury, Nether Alderley, and Mottram St Andrew, beneath the wooded Edge escarpment. Its housing is defined by substantial detached homes and villas on mature plots, Victorian and Edwardian houses, replacement dwellings, and older cottages in sensitive settings. It is also a village shaped by two conservation areas, a made Neighbourhood Plan, Green Belt and countryside around its edges, mature trees, and design expectations well above the suburban norm.
None of that stands in the way of exceptional building work in Alderley Edge. It does mean that property value never overrides planning. A glazed rear extension to a villa on a mature plot, the whole-house reconfiguration of an Edwardian home, a replacement dwelling on a leafy residential road — each one turns on conservation sensitivity, tree protection, structural sequencing, and a planning route that has to be established before the design is fixed.
JNR Construction engages before drawings are finalised. We establish what Local Plan and Neighbourhood Plan policy, the conservation area, Building Control, and your ground conditions allow on the plot — then we build it as Principal Contractor under CDM 2015, with a dedicated project manager, discreet and well-presented site management, and one point of accountability through to Completion Certificate.
High-end rear extensions and orangeries on Alderley Edge villas and substantial detached homes — structural steelwork and temporary propping, foundations designed around mature trees, sympathetic detailing, and Parts L and O compliance.
Whole-house renovation and reconfiguration of Alderley Edge homes before you move in. New open-plan structural openings, solid-wall moisture management, drainage upgrades, and a high-specification fit-out, all under one project manager.
Architect-designed replacement dwellings and one-off homes on Alderley Edge’s mature plots, with demolition sequencing and Green Belt openness addressed early. JNR acts as Principal Contractor under CDM 2015 through to completion.
Loft conversions on Alderley Edge villas and substantial family homes where roof form allows — structural roof assessment, protected Part B escape routes, compliant Part K staircases, and conservation-sensitive dormer design.
Structural steelwork design and installation in Alderley Edge — goalpost frames and beams for open-plan kitchens and wider openings, long spans for remodelled dwellings, engineer’s calculations and Part B fire protection.
Conservation area work across Alderley Edge and Davey Lane — villa-sensitive repairs, brick, stone, slate, and timber matched to original fabric, boundary walls and gates, and details approved by the Conservation Officer.
JNR Construction works as Principal Contractor on commercial refurbishment and fit-out across Alderley Edge and the wider SK9 area — London Road and the surrounding village — restaurants and bars, independent retail, salons, and professional offices on the floors above. The work runs under CDM 2015 with one point of accountability, and it is phased around trading hours where the premises cannot close.
Most Alderley Edge commercial work is a change of use or a hospitality fit-out in a building with flats above it. That puts Part E sound separation, Part B compartmentation and kitchen extract routing at the centre of the design, and it usually means working to hours agreed with the occupiers upstairs.
Two conservation areas: Alderley Edge and Davey Lane. The main area has featured on Historic England’s Heritage at Risk Register.
Alderley Edge sits within Cheshire East Council, which determines planning applications for the village and operates Building Control, unless a Registered Building Control Approver is appointed. For substantial extensions, structural alterations, loft conversions, replacement dwellings, and any conservation area or listed building project, Full Plans is the safer route — structure, fire safety, drainage, and energy performance are approved before work starts, not resolved on site.
The Alderley Edge Neighbourhood Plan was made on 28 July 2021, following a referendum on 6 May 2021. It forms part of the statutory development plan alongside the Cheshire East Local Plan Strategy and the Site Allocations and Development Policies Document, so planning applications in the village are assessed against its policies as well as Cheshire East’s. The Community Infrastructure Levy applies where development creates chargeable floorspace, with the rate confirmed against the current Cheshire East charging schedule.
Cheshire East’s mapping identifies two conservation areas: Alderley Edge and Davey Lane. Cheshire East has reviewed the Alderley Edge Conservation Area, which was placed on Historic England’s Heritage at Risk Register because of development pressure and erosion of its significance. That history shapes how proposals are judged today. The loss or alteration of villas, demolition, and replacement dwellings are scrutinised closely, and applications need strong design and heritage evidence.
Cheshire East applies Article 4 Directions in some conservation areas across the borough. Where one applies, works that would normally be permitted development — replacement windows and doors, roof alterations, cladding, and boundary treatments — may need planning permission. Article 4 status is checked on the live Cheshire East map for every Alderley Edge address before permitted development is relied on. None of this prevents the work. It does mean the correct route is identified at feasibility, not after groundworks.
In and around the conservation areas, the details carry the weight. Replacement windows and doors, dormers, cladding, boundary walls, gates, and driveways all affect street character, and mature trees and landscape setting are often part of what makes a property valuable. Where a building is listed, Listed Building Consent is separate from planning permission and can apply to internal alterations as well as external works.
Green Belt and countryside policy surrounds much of the village, towards Nether Alderley, Mottram St Andrew, and the wooded Edge. It does not prevent development, but it changes the test: extensions should not be disproportionate additions to the original dwelling, and replacement dwellings should not be materially larger or more harmful to openness than the house they replace. Premium property value does not override those tests.
Watercourses, culverts, surface-water flow, and older land drainage can all affect plot design. Not every Alderley Edge property carries flood risk, so each site is checked against the Environment Agency flood map and Cheshire East surface-water data. United Utilities build-over agreements, CCTV drainage surveys, and a surface water strategy for large roofs, terraces, and driveways are routine early items.
Ground conditions vary across the village, and rising ground towards the Edge escarpment can bring stone, level changes, and retaining structures into play. Mature trees bring root protection areas, Tree Preservation Orders, and conservation area tree controls. Older villas may have shallow foundations, solid walls, older roof structures, and non-standard drainage, while highly glazed extensions need careful attention to Part L energy performance, Part O overheating, and Part F ventilation.
We do not make assumptions about any of this. Every JNR feasibility in Alderley Edge includes a site-specific check of conservation area mapping, the Article 4 register, listed building records, Local Plan and Neighbourhood Plan policies, Green Belt, tree constraints, flood-risk mapping, public sewer records, and the Building Control route.
Four stages. One dedicated project manager. Discreet, controlled delivery on every Alderley Edge project.
We engage before drawings are finalised. Julian Rowlands reviews the project brief, the site constraints, and the structural intent — identifying the risks that appear in construction but originate in design. We provide a realistic cost assessment based on the scope, not a low number designed to win the job. If the project is not viable within your budget, we say so at this stage rather than halfway through a build.
Every project starts with a site visit and a structured pre-construction conversation covering: the structural approach (what steelwork, what groundworks, what temporary works are likely to be required), the regulatory framework (which Approved Documents apply, whether CDM 2015 notifications are required, whether Listed Building Consent or Conservation Area approval is needed), and the programme implications (realistic timescales for both the pre-construction phase and the build itself).
This engagement costs nothing and commits you to nothing. It does give JNR enough information to provide an accurate preliminary cost plan — not a ballpark figure, but a structured document showing where the costs are concentrated and why.
Where an architect is already appointed, we engage directly with their drawing package at this stage, providing a buildability review and raising any technical queries before the design is finalised. This is the most cost-effective point at which to resolve structural ambiguities.
We do not begin construction until every pre-commencement obligation is satisfied. This is not caution for its own sake — it is the only way to protect the programme once the build starts.
Pre-construction work on a typical JNR project covers:
Building Regulations. Full Plans application submitted to the Local Authority Building Control or an Approved Inspector. Structural calculations produced by the appointed structural engineer and incorporated into the submission. We coordinate between the structural engineer, the architect, and the Building Control Officer to resolve any queries before an approval is issued — not after work has started.
Party Wall. Where the proposed works affect a boundary wall or involve excavation near an adjoining owner's property, Party Wall Notices are served under the Party Wall etc. Act 1996. We assess which notices are required, prepare the notice documentation, and appoint a surveyor where the adjoining owner requires one. We do not begin works within the Act's scope without the notices being formally in place.
CDM 2015 Construction Phase Plan. On projects where CDM 2015 applies, the Construction Phase Plan is prepared and in place before the construction phase begins. This is a statutory requirement under Regulation 12(1) of CDM 2015, not a discretionary document.
Planning condition discharge. Pre-commencement planning conditions are formally discharged with the Local Planning Authority before groundworks begin. Conditions typically cover materials, drainage, ecology, and construction management — each requiring a formal submission and written approval.
Asbestos. On properties constructed before 2000, we require confirmation of a refurbishment/demolition asbestos survey before any strip-out works commence, per the Control of Asbestos Regulations 2012.
JNR Construction is formally appointed as Principal Contractor under Regulation 5 of CDM 2015 on all qualifying projects. This is not a marketing claim — it is a legal dutyholder appointment, made in writing, before the construction phase begins.
As Principal Contractor, JNR's responsibilities include:
Site management. The site is run to a Construction Phase Plan that sets out the site rules, induction requirements, emergency procedures, and method statements for high-risk activities. Every trade operative on site is inducted. Unauthorised access is prevented. Facilities meeting Schedule 2 of CDM 2015 are in place from day one.
Trade coordination. JNR coordinates all subcontractors and specialist trades — structural steelwork, groundworks, M&E, plastering, joinery, glazing, roofing — to a sequenced programme. Trades are appointed against the specification, not substituted for cheaper alternatives without the client's knowledge.
Variation control. All changes to the agreed scope of works are formally issued in writing by the client or their contract administrator, priced by JNR, agreed in writing, and incorporated into the contract sum before the works proceed. Verbal instruction does not constitute a valid variation.
Progress reporting. Clients receive structured progress updates — what has been completed, what is on programme, what (if anything) is at risk — at agreed intervals throughout the build. You are not left waiting to visit site to find out what is happening.
Quality inspections. Staged quality checks are carried out at key milestones: prior to closing in any structural element, prior to first fix boarding, and prior to second fix. Building Control inspections are co-ordinated and attended by JNR's site manager.
Practical completion is not the end of JNR's accountability — it is the beginning of the documented record of everything that was built and how it was built.
At practical completion, the handover package includes:
Building Regulations Completion Certificate. Issued by the Local Authority Building Control or Approved Inspector confirming that the works have been inspected and comply with the relevant Parts of the Building Regulations.
CDM Health and Safety File. Required under Regulation 12(5) of CDM 2015 on all qualifying projects. The file documents the as-built structure, the materials used, the services installed, and any information that will be needed for future maintenance or alteration. It is handed to the client at completion and must be passed on with the property on any future sale.
Gas Safe and Part P certification. All gas work certified by a Gas Safe registered engineer. All electrical work certified by a Part P registered operative, with the appropriate Building Regulations notification.
O&M manuals. Operating and maintenance documentation for installed systems — heating, ventilation, mechanical plant — so the client understands how the building works and what routine maintenance is required.
Snagging record. A formal snagging list produced at practical completion, agreed with the client, and resolved within the defects liability period specified in the contract.
The defects liability period (typically 12 months under a JCT Homeowner Contract) runs from practical completion. If defects attributable to JNR's works appear during that period, we return and resolve them. The client has a direct contractual remedy — not a series of phone calls to a company that has moved on.
Front and Rear Extension & Remodel, Alderley Edge
This total property transformation required more than standard building practices; it demanded complex structural engineering. We installed heavy structural steelwork to alter the load paths, safely supporting wide-span rear glazing to create a modern open-plan footprint. On the exterior, we executed the architect’s vision of a striking contemporary contrast, expertly integrating the new high-specification brick additions against the original white-painted property. The result is a bold, fully Part L energy-compliant home that perfectly bridges the existing structure with modern architectural design.
“I own one of Cheshire’s most prestigious estate agencies and am frequently asked to recommend reliable building companies. I have used JNR Construction for both domestic and commercial work and have first-hand experience of their workmanship and professionalism. The interior oak work has been expertly crafted. I feel fully justified in putting forward JNR Construction.”
Not always, but it should never be assumed. Permitted development rights are reduced inside the Alderley Edge and Davey Lane conservation areas, can be removed by an Article 4 Direction or earlier planning conditions, and do not override Listed Building Consent. On Green Belt plots around the village, extensions that need planning permission are judged on whether they are proportionate to the original house, and the made Neighbourhood Plan adds local policy. Every Alderley Edge feasibility checks the Cheshire East adopted policies map, conservation area records, and the planning history before any application route is recommended.
It may be. Cheshire East identifies two conservation areas in the village — Alderley Edge and Davey Lane — and many homes sit outside both. The boundary for your address should be checked against Cheshire East's live conservation area mapping before external works are specified. The Alderley Edge Conservation Area was placed on Historic England's Heritage at Risk Register because of development pressure, so proposals inside it are judged carefully. Windows, doors, dormers, cladding, boundary walls, gates, driveways, and tree works can all need consent, and applications need strong design evidence.
Possibly. Cheshire East applies Article 4 Directions in some conservation areas across the borough, and where one applies, works that are normally permitted development — replacement windows and doors, roof alterations, cladding, and boundary treatments — may need planning permission. Article 4(2) controls generally apply to elevations fronting a highway and to houses rather than flats or commercial premises. The only reliable answer for a specific Alderley Edge address is the live Cheshire East Article 4 map, which we check at feasibility on every project.
Sometimes, but replacement dwellings are among the most scrutinised proposals in the village. Inside a conservation area, the loss of an existing villa is judged on its contribution to character. On Green Belt plots, a replacement should not be materially larger or more harmful to openness than the house it replaces. Neighbourhood Plan policies apply alongside Cheshire East's. Where consent is achievable, the build itself needs careful demolition sequencing, tree protection, drainage design, and site management on a quiet residential road. We assess all of this at feasibility with your architect, before design time is committed.
Significantly. Mature trees shape foundation design, excavation method, drainage runs, crane access, and where materials can be stored, and trees in a conservation area or under a Tree Preservation Order need notice to or consent from Cheshire East. Older villas often have shallow foundations, solid walls, older roof structures, and non-standard drainage. Opening them up for open-plan living means structural steelwork, padstones, temporary propping, and careful sequencing. We review trees, trial pits, and the existing structure at feasibility, so the engineering design reflects the house as it actually is.
Yes. Architect-led projects are central to how we work. We engage at RIBA Stage 2 or 3 — before drawings are finalised — with a constructability review, structural feedback, a planning, heritage, and Neighbourhood Plan risk assessment, and an early cost plan. We then contract under JCT and deliver as Principal Contractor under CDM 2015, building to specification without unauthorised material substitution. A dedicated project manager runs the site, the programme, and communication with neighbours. The architect retains design authorship throughout, and we never value-engineer a design without instruction.
Whether your architect’s drawings are complete, planning consent is in hand, or you simply have an Alderley Edge address and an ambition to test against reality — a 20-minute conversation with Julian is where every JNR project begins.