JNR Construction is a Macclesfield-based design-to-build partner and FMB Master Builder. For SK10 and SK11 homeowners planning substantial work, and architects who need a contractor they can refer without risk — extensions, whole-house renovation, bespoke new builds, and heritage work, managed under CDM 2015.

20 Years. 400+ Projects. Federation of Master Builders.

MACCLESFIELD DESIGN AND BUILD PARTNER

Macclesfield homes need more than a general builder.

Macclesfield spans the SK10 and SK11 postcode districts within Cheshire East — a historic silk town where the Cheshire Plain meets the Peak District foothills, with Victorian terraces, Edwardian villas, inter-war family homes, and larger detached plots in Tytherington, Upton, Broken Cross, and west Macclesfield. It is also a town shaped by more than ten conservation areas, Grade II* landmarks on Market Place, Green Belt around its edges, the Macclesfield Canal corridor, and a River Bollin flood warning area running through Park Green, Waterside, and Mill Lane.

None of that prevents excellent building work in Macclesfield. It does mean a generic builder is the wrong partner. The projects that matter here — a two-storey extension on a detached home in Tytherington, a whole-house renovation of a Victorian villa before moving in, steelwork to open up a period house in the Park Lane conservation area — fail when the contractor finds a heritage control, a build-over agreement, a retaining wall on a sloping plot, or a foundation issue halfway through the programme.

JNR Construction is based in Macclesfield and engages before drawings are finalised. We identify the planning, heritage, Building Control, drainage, and ground-condition constraints that decide what is buildable on your site — then we build it as Principal Contractor under CDM 2015, with a dedicated project manager and one point of accountability through to Completion Certificate.

What we build in Macclesfield.

House extensions

Single-storey, two-storey, and wraparound extensions on Macclesfield’s Victorian, Edwardian, and inter-war homes — structural steelwork, stepped foundations on sloping plots, materials matched to existing fabric, and Parts A, B, and L compliance.

Home renovation

Whole-house renovation for Macclesfield period and family homes before you move in. Fabric-first damp assessment, drainage renewal, open-plan steelwork, roofs, insulation, and high-specification fit-out, all sequenced under one project manager.

Bespoke new builds

Architect-designed one-off homes and replacement dwellings on Macclesfield’s larger plots and Green Belt-edge sites towards Prestbury and Gawsworth. JNR acts as Principal Contractor under CDM 2015 — groundworks through to Completion Certificate.

Completed dormer loft conversion in a Wilmslow detached property, with structural ridge beam and bespoke staircase by JNR Construction.

Loft conversions

Dormer, hip-to-gable, and mansard loft conversions on Macclesfield terraces, semis, and villas — roof structure surveys, Part B protected escape routes, Part K staircase compliance, and weathering planned for exposed hillside sites.

Commercial construction

Commercial refurbishment and fit-out in Macclesfield’s historic town centre and former mill buildings — fire compartmentation, escape routes, accessibility, CDM 2015 governance, and minimum-disruption phasing around live trading hours.

Heritage Renovation

Conservation area and listed building work in Macclesfield — lime mortar pointing, breathable repairs, joinery profiles, and Conservation Officer-approved details for the Town Centre, Canal, Park Green, and Christ Church areas.

Planning, conservation and Article 4 in Macclesfield.

The St Bartholomew's Conservation Area in Wilmslow — context for JNR Construction's conservation-area and heritage work in SK9.

Macclesfield’s conservation areas include Town Centre, Macclesfield Canal, Park Green, and Christ Church. Each shapes what is built.

Macclesfield sits within Cheshire East Council, which determines every planning application in the town and operates Building Control. Macclesfield Town Council is consulted on applications but does not decide them. Cheshire East accepts both Full Plans and Building Notice submissions — but for substantial extensions, structural alterations, loft conversions, new builds, and any conservation area or listed building project, Full Plans is the safer route.

The development plan for Macclesfield is the Cheshire East Local Plan Strategy, the Site Allocations and Development Policies Document, and saved Macclesfield Borough policies where relevant. The Local Plan Strategy names Macclesfield as a Principal Town, planning for around 4,250 new homes including the South Macclesfield Development Area. Cheshire East’s Community Infrastructure Levy applies where development creates chargeable floorspace, with the rate for any site confirmed against the current charging schedule and map.

Macclesfield has more than ten conservation areas, including Town Centre, Macclesfield Canal, High Street, Park Green, Park Lane, Christ Church, Buxton Road, and Hurdsfield Road. The Town Centre Conservation Area Appraisal was adopted in 2022. Inside a conservation area, applications must be full rather than outline, smaller extensions may be more restricted, and a heritage statement is often required to show how character and appearance will be protected.

Some Macclesfield properties are also subject to Article 4 Directions. Where Article 4(2) applies, planning permission may be required for works that are normally permitted development — replacement windows, doors, roofs, chimneys, architectural details, boundary walls, porches, hardstandings, and the painting of previously unpainted brickwork. It generally applies to elevations fronting a highway and to houses rather than flats or commercial property. None of this prevents the work. It does mean the correct application route must be identified at feasibility, not after groundworks.

Macclesfield Town Hall and the Church of St Michael and All Angels on Market Place are both Grade II* listed, the Town House on King Edward Street is Grade II listed, and the early medieval cross shafts in West Park are a scheduled monument. Listed Building Consent is separate from planning permission and can apply to internal alterations. Heritage work here is about fabric, breathability, and repair philosophy — not simply matching the look.

Green Belt surrounds the town. Replacement dwellings, large extensions, outbuildings, and annexes on edge-of-town plots towards Prestbury, Bollington, Gawsworth, Sutton, Langley, and Rainow cannot rely on urban assumptions. Settlement boundary, Green Belt policy, landscape impact, access, and any planning conditions removing permitted development rights all need checking before design is fixed.

The River Bollin at Macclesfield flood warning area covers land and property near Mill Lane, River Street, Stubbs Terrace, Waterside, Park Green, Sunderland Street, and parts of Brook Street. Works near the Macclesfield Canal can bring retaining walls, embankments, and water management into play. For any basement, extension, drainage, or landscaping project near either corridor, flood risk is checked site by site at feasibility — never assumed.

Ground conditions change across the town, from the Cheshire Plain to the rising ground of the Peak District fringe. Sloping plots need retaining walls, stepped foundations, temporary works, and surface-water control. Older town-centre and terraced plots can hide cellars, made ground, historic clay drainage, and shallow foundations. Tree-lined suburban plots bring Tree Preservation Orders, root influence, and heave protection, and United Utilities build-over agreements apply where work falls within relevant distances of a public sewer.

We do not make assumptions about any of this. Every JNR feasibility includes a site-specific check of conservation area mapping, the Article 4 register, listed building records, Local Plan policies, Green Belt, flood-risk mapping, public sewer records, and the Building Control route.

Managed from concept to handover.

Four stages. A dedicated project manager. No gaps between design and build on any Macclesfield project.

  1. Feasibility and early engagement

    We engage before drawings are finalised. Julian Rowlands reviews the project brief, the site constraints, and the structural intent — identifying the risks that appear in construction but originate in design. We provide a realistic cost assessment based on the scope, not a low number designed to win the job. If the project is not viable within your budget, we say so at this stage rather than halfway through a build.

    Every project starts with a site visit and a structured pre-construction conversation covering: the structural approach (what steelwork, what groundworks, what temporary works are likely to be required), the regulatory framework (which Approved Documents apply, whether CDM 2015 notifications are required, whether Listed Building Consent or Conservation Area approval is needed), and the programme implications (realistic timescales for both the pre-construction phase and the build itself).

    This engagement costs nothing and commits you to nothing. It does give JNR enough information to provide an accurate preliminary cost plan — not a ballpark figure, but a structured document showing where the costs are concentrated and why.

    Where an architect is already appointed, we engage directly with their drawing package at this stage, providing a buildability review and raising any technical queries before the design is finalised. This is the most cost-effective point at which to resolve structural ambiguities.

  2. Pre-construction and compliance

    We do not begin construction until every pre-commencement obligation is satisfied. This is not caution for its own sake — it is the only way to protect the programme once the build starts.

    Pre-construction work on a typical JNR project covers:

    Building Regulations. Full Plans application submitted to the Local Authority Building Control or an Approved Inspector. Structural calculations produced by the appointed structural engineer and incorporated into the submission. We coordinate between the structural engineer, the architect, and the Building Control Officer to resolve any queries before an approval is issued — not after work has started.

    Party Wall. Where the proposed works affect a boundary wall or involve excavation near an adjoining owner's property, Party Wall Notices are served under the Party Wall etc. Act 1996. We assess which notices are required, prepare the notice documentation, and appoint a surveyor where the adjoining owner requires one. We do not begin works within the Act's scope without the notices being formally in place.

    CDM 2015 Construction Phase Plan. On projects where CDM 2015 applies, the Construction Phase Plan is prepared and in place before the construction phase begins. This is a statutory requirement under Regulation 12(1) of CDM 2015, not a discretionary document.

    Planning condition discharge. Pre-commencement planning conditions are formally discharged with the Local Planning Authority before groundworks begin. Conditions typically cover materials, drainage, ecology, and construction management — each requiring a formal submission and written approval.

    Asbestos. On properties constructed before 2000, we require confirmation of a refurbishment/demolition asbestos survey before any strip-out works commence, per the Control of Asbestos Regulations 2012.

  3. The build — on programme

    JNR Construction is formally appointed as Principal Contractor under Regulation 5 of CDM 2015 on all qualifying projects. This is not a marketing claim — it is a legal dutyholder appointment, made in writing, before the construction phase begins.

    As Principal Contractor, JNR's responsibilities include:

    Site management. The site is run to a Construction Phase Plan that sets out the site rules, induction requirements, emergency procedures, and method statements for high-risk activities. Every trade operative on site is inducted. Unauthorised access is prevented. Facilities meeting Schedule 2 of CDM 2015 are in place from day one.

    Trade coordination. JNR coordinates all subcontractors and specialist trades — structural steelwork, groundworks, M&E, plastering, joinery, glazing, roofing — to a sequenced programme. Trades are appointed against the specification, not substituted for cheaper alternatives without the client's knowledge.

    Variation control. All changes to the agreed scope of works are formally issued in writing by the client or their contract administrator, priced by JNR, agreed in writing, and incorporated into the contract sum before the works proceed. Verbal instruction does not constitute a valid variation.

    Progress reporting. Clients receive structured progress updates — what has been completed, what is on programme, what (if anything) is at risk — at agreed intervals throughout the build. You are not left waiting to visit site to find out what is happening.

    Quality inspections. Staged quality checks are carried out at key milestones: prior to closing in any structural element, prior to first fix boarding, and prior to second fix. Building Control inspections are co-ordinated and attended by JNR's site manager.

  4. Handover and aftercare

    Practical completion is not the end of JNR's accountability — it is the beginning of the documented record of everything that was built and how it was built.

    At practical completion, the handover package includes:

    Building Regulations Completion Certificate. Issued by the Local Authority Building Control or Approved Inspector confirming that the works have been inspected and comply with the relevant Parts of the Building Regulations.

    CDM Health and Safety File. Required under Regulation 12(5) of CDM 2015 on all qualifying projects. The file documents the as-built structure, the materials used, the services installed, and any information that will be needed for future maintenance or alteration. It is handed to the client at completion and must be passed on with the property on any future sale.

    Gas Safe and Part P certification. All gas work certified by a Gas Safe registered engineer. All electrical work certified by a Part P registered operative, with the appropriate Building Regulations notification.

    O&M manuals. Operating and maintenance documentation for installed systems — heating, ventilation, mechanical plant — so the client understands how the building works and what routine maintenance is required.

    Snagging record. A formal snagging list produced at practical completion, agreed with the client, and resolved within the defects liability period specified in the contract.

    The defects liability period (typically 12 months under a JCT Homeowner Contract) runs from practical completion. If defects attributable to JNR's works appear during that period, we return and resolve them. The client has a direct contractual remedy — not a series of phone calls to a company that has moved on.

Architect-Led Design in SK10

Front and Rear Extension & Remodel, Macclesfield

This total property transformation required more than standard building practices; it demanded complex structural engineering. We installed heavy structural steelwork to alter the load paths, safely supporting wide-span rear glazing to create a modern open-plan footprint. On the exterior, we executed the architect’s vision of a striking contemporary contrast, expertly integrating the new high-specification brick additions against the original white-painted property. The result is a bold, fully Part L energy-compliant home that perfectly bridges the existing structure with modern architectural design.

Designed by Plan Architectures

Trusted by homeowners and professionals.

“I own one of Cheshire’s most prestigious estate agencies and am frequently asked to recommend reliable building companies. I have used JNR Construction for both domestic and commercial work and have first-hand experience of their workmanship and professionalism. The interior oak work has been expertly crafted. I feel fully justified in putting forward JNR Construction.”

Edward Naden — Holmes Naden Independent Estate Agents

Macclesfield building work — common questions.

A:

Not always. Many single-storey rear extensions, modest side extensions, and loft conversions on Macclesfield homes can be built under permitted development. Those rights are reduced or removed inside Macclesfield's conservation areas, where an Article 4 Direction applies, on listed buildings, in the Green Belt around the town, and where existing planning conditions restrict further development. Newer estate homes may also carry conditions or covenants. Every Macclesfield feasibility includes a site-specific check against the Cheshire East adopted policies map, the conservation area register, and the planning history before any application route is recommended.

A:

Possibly. Macclesfield has more than ten conservation areas, including Town Centre, Macclesfield Canal, High Street, Park Green, Park Lane, Christ Church, Buxton Road, and Hurdsfield Road. The Town Centre Conservation Area Appraisal was adopted in 2022. Many Macclesfield homes sit outside these boundaries — but for any property in the historic centre, beside the canal, or on the older routes out of town, the boundary needs checking against the live Cheshire East mapping before external works, materials, or replacements are specified. Inside a conservation area, a heritage statement is often required.

A:

Only some Macclesfield properties are affected, so it must be checked address by address. Cheshire East's guidance is that Article 4(2) Directions generally apply to elevations fronting a highway and to houses rather than flats or commercial properties, and that they can remove permitted development rights for replacement windows, doors, roofs, chimneys, architectural details, boundary walls, porches, hardstandings, and the painting of previously unpainted brickwork. The practical answer is to check the live Cheshire East Article 4 register before assuming any work is permitted development. We do this at feasibility on every project.

A:

For any site within the River Bollin at Macclesfield flood warning area — which covers land and property near Mill Lane, River Street, Stubbs Terrace, Waterside, Park Green, Sunderland Street, and parts of Brook Street — flood risk needs addressing at feasibility and planning stage. Not every property near the river is at risk, so it is checked site by site. For basements, cellar conversions, extensions close to the river or canal corridor, or landscaping that alters surface-water flow, the GOV.UK Flood Map for Planning and a flood risk assessment appropriate to the scale of development will normally be required.

A:

Significantly. Macclesfield sits where the Cheshire Plain rises towards the Peak District fringe, so many plots in and around the town fall across the site. Extensions and new builds on sloping ground often need engineer-designed retaining walls, stepped foundations, temporary works during excavation, and surface-water control to stop runoff affecting neighbours. Access, scaffold, and deliveries need planning too, especially on terraced streets and hillside properties towards Sutton, Langley, and Rainow. We assess levels, drainage, and access at feasibility, so the structural design and programme reflect the site as it actually is.

A:

Yes. The JNR model is design-to-build partnership, not design-versus-build adversarial. We engage at RIBA Stage 2 or 3 — before drawings are finalised — to provide a constructability review, structural feedback, planning and conservation risk assessment, and an early cost plan. We then tender, contract under JCT, and deliver as Principal Contractor under CDM 2015, with a dedicated project manager on every job. The architect retains design authorship throughout, and we do not value-engineer a design without instruction. Architects across Cheshire East who want a contractor they can refer without reputational risk are the audience this page is written for.

Thinking of extending in Macclesfield?

Whether you have an architect’s drawings ready, a planning consent in hand, or simply a Macclesfield address and an ambition to test against reality — a 20-minute conversation with Julian is where every JNR project begins.